Today
A customer needs a cut length of SS304 bar with its mill test certificate. There may already be a suitable offcut in the godown.

A product code tells you what an item is. It does not tell you which bundle is free, where it is stored or which certificate belongs to it.
A customer needs a cut length of SS304 bar with its mill test certificate. There may already be a suitable offcut in the godown.
Sales checks the stock sheet and asks stores to find a suitable piece.
Stores checks racks and leftover lengths by hand.
The office searches email folders for the correct heat certificate.
After cutting, the remaining piece goes back without an updated record.
Connected steps.
Clear checks along the way.
Record the received batch, grade, size, heat number, quantity and rack location. Attach the reviewed mill test certificate to that batch and give it a scannable label.
Stores checks the physical marking against the record. The certificate must match the batch, not just the grade.
Search by grade, section and required length. Show usable remnants as well as full stock. Exclude reserved material and QC holds from the available balance.
Confirm customer-specific requirements before selecting a substitute or a remnant.
Reserve the selected piece. After cutting, record the measured remainder and cutting loss. Give the remnant its own label and keep its link to the original heat.
The operator confirms the actual remaining length. A nominal subtraction does not account for saw kerf and trimming.
Build the dispatch document pack from the selected batches. Keep the material history through splits, processing and returns, so a later quality query can be traced backwards.
Missing or mismatched certificates are held for review before release.